Olmsted Lock involved construction of a new lock on the Ohio
River. During construction, the site was flooded by direction
of owner with resulting increased costs and delay. The designs
for reinforcing steel and concrete were defective and resulted
in claims for recovery of increased costs. The parties and
their counsel used negotiation to resolve the claims. (Owner:
Corps of Engineers, Louisville District)