This massive civil works project involved excavating, hauling and placing over 65 million cubic yards of material to create two dams, the largest (West Dam) being 1.7 miles long. The foundation for the dam and the borrow areas contained differing site conditions. Smith Pachter McWhorter PLC prepared claims, which were presented and resolved through mediation. (Owner: Metropolitan Water District of Southern California).